Submarines and the Future of Defense Manufacturing

25 Mar 2026 · 24 min · 15 chapters

Ask about this episode

Ask anything about it. ChatGPT or Claude reads this page and answers with the times it was said.

Connect VO and ask about every podcast you hear, including the moments you saved. Add to ChatGPT · Add to Claude

In short

Rebuilding US submarine defense manufacturing capacity for stealth missions and nuclear deterrence, using software-driven advanced factories to solve a “people” and productivity shortfall (not a budget shortfall).

Guests

Chris Power, founder and CEO of Hadrian, building advanced manufacturing facilities; Vice Admiral Robert Goucher, Pentagon’s first direct reporting portfolio manager for submarines (“submarine czar”), overseeing US Navy submarine production.

Key claims

Submarines provide stealth and global access; ballistic missile submarines are the survivable second-strike leg of the nuclear triad. After the Cold War, manufacturing collapsed (nine out of ten jobs vanished). Columbia-class and fleet replenishment require ~70 million labor hours—over 5x prior capacity. The main bottleneck is missing skilled workers; software and advanced factories must compress training and raise productivity.

Notable examples

Hadrian Factory 4 (2.25M sq ft) for Columbia and Virginia-class; mid-1980s rate of four nuclear submarines/year; sequence-critical parts and obsolete parts (e.g., air flasks, escape-trunk hatches); drones as modular corollaries but submarines as multi-mission command/control platforms.

Written by AI. May contain mistakes. Listen to the episode to check what was said.

Chapters

Tap a time to open that second in VO

The Stealth Advantage of Submarines

0:00 to 0:21

Learn how submarines offer stealth and strategic deterrence in defense.

“The real advantage that submarines bring is our stealth and access.”

The Decline of U.S. Manufacturing

0:21 to 0:47

Understand the historical context of submarine manufacturing post-Cold War.

“At the end of the Cold War, we walked away from manufacturing.”

Current Demands for Submarine Production

0:47 to 1:23

Explore the labor requirements for modern submarine programs and challenges faced.

“In the mid-1980s, the United States built four nuclear submarines a year.”

The Role of the Navy and Submarines

2:09 to 2:55

Learn about the Navy's role in maintaining global security and the importance of submarines.

“For those of you that are not familiar with the Defense Industrial Base, the Navy is an extraordinary force.”

Strategic Deterrence Through Submarines

2:55 to 4:13

Discover how submarines act as a deterrent against nuclear warfare.

“We're opening of Hadrian's Factory 4, a 2.25 million square foot advanced manufacturing facility that's going to support the Columbia and Virginia class submarine programs.”

Industrial Capacity and Workforce Challenges

4:13 to 6:05

Examine the industrial capacity issues and the skilled workforce shortage in shipbuilding.

“So that assures that any country that tried to attack us with nuclear weapons would be destroyed.”

The Role of the Submarine Czar

6:05 to 7:09

Understand the significance of having a dedicated submarine czar in the Pentagon.

“And then we told all the kids in the 80s and 90s that in manufacturing, go get a four-year journalism degree.”

Success Metrics for Submarine Production

7:09 to 8:13

Discuss how success can be measured in submarine delivery and production rates.

“That means you report directly to Deputy Defense Secretary Steven Feinberg.”

Navigating Challenges in Restarting Industrial Base

8:13 to 10:39

Learn about the difficulties faced in restarting the submarine manufacturing base.

“could just be short-circuited so that we really focus on the outcome that we want, which is to build more submarines, to stand up Golden Dome, and then to fix our ground-based leg and air-based leg of the triad.”

Modern Conflicts and Submarine Relevance

10:39 to 13:31

Explore the relevance of submarines in modern warfare and technological advancements.

“And that's been the biggest sea change of how easy or hard it is to deal with legislature, the Navy, the Department of War.”
Show all 15 chapters

The Future of Advanced Manufacturing

13:31 to 14:01

Discover how advanced manufacturing techniques will transform submarine production.

“It's really going to be a modern, advanced manufacturing facility.”

Enhancing Workforce Productivity in Submarine Manufacturing

14:01 to 15:33

Learn how software can reduce workforce needs and improve submarine construction efficiency.

“So we have to augment the skills with software and also make it more accessible for training new workforce.”

Addressing Submarine Maintenance and Production Challenges

15:34 to 18:11

Explore the challenges of submarine maintenance and how to improve production capabilities.

“and your other facilities and people are going to come to start to recognize the importance of being able to change out the product line, increased throughput, have better visibility into the entire production line.”

Correlating Drone Manufacturing with Submarine Production

18:12 to 20:46

Discover the similarities and differences between drone and submarine manufacturing processes.

“I think, yeah, having software, as Chris mentioned, play a role in making sure that, you know, if you only have 95 % of the parts, that's not enough to make a submarine.”

The Complexity of Submarine Design and Construction

20:47 to 22:20

Understand the complexities involved in constructing and designing submarines.

“So, Chris, I want to kind of start to wrap up with you here.”
Hear the part that matters, and keep it.Open this episode in VO. Double tap your headphones to save a moment as you listen.
Get VO free

Transcript

Automatic transcript. May contain errors.

0:00David Ulevitch:The real advantage that submarines bring is our stealth and access. We can pretty much go anywhere in the world undetected. We can carry nuclear missiles on our ballistic missile submarines and that ensures that we continue our decades of peace without nuclear war, that any country that tried to attack us with nuclear weapons would be destroyed. At the end of the Cold War, we walked away from manufacturing. The amount of work that we need now to replenish our fleet is on the order of about 70 million hours.

0:31Chris Power:The power of combining the new workforce, American software, American steel, and American spirit, is you have to get this productivity jump somehow with advanced factories. It's not a money problem. We have to get this productivity uplift by fusing workforce trading and software together to go a lot faster. In the mid-1980s, the United States built four nuclear submarines a year. Then the Cold War ended, production collapsed, and nine out of ten manufacturing jobs vanished. An entire generation was told to skip the factory floor. Four decades later, the Navy needs more than five times the capacity it had a decade ago.

1:08Chris Power:The Columbia-class program requires roughly 70 million labor hours. The workers who could fill them aged out. and nobody replaced them. This is not a budget problem. The money exists. The people do not. The question is whether software-driven manufacturing can compress a decade of training into something the country can scale. David Yulovich speaks with Chris Power, founder and CEO at Hadrian, and Vice Admiral Robert Goucher, the Pentagon's first submarine czar.

1:43Robert Gaucher:I am very, very, very, very lucky to have two incredible folks joining me on stage. This is going to be a conversation you do not want to miss. So in addition to having Chris Power, the founder and CEO of Hadrian, who you heard earlier, we also have Admiral Robert Goucher, who is in charge of all submarine production for the United States Navy. Let me give you a quick background. For those of you that are not familiar with the Defense Industrial Base, the Navy is an extraordinary force. They operate across the largest domain on Earth. They cover more than 70 % of the planet. And the Navy is responsible for projecting American power, maintaining deterrence, and ensuring stability across that entire space.

2:34Robert Gaucher:This is a service that has been operating continuously since 1775. That's 250 years already. It's adapted into new technologies, new threats, new missions, and it remains one of the most capable institutions in the world. And that's why we're here in Cherokee. That's why we're opening this facility. We're opening of Hadrian's Factory 4, a 2.25 million square foot advanced manufacturing facility that's going to support the Columbia and Virginia class submarine programs. So let's start out actually with you, Admiral. For people that are not familiar with the real world problems, what problems do we solve with submarines?

3:17Robert Gaucher:Why do we have a submarine program and why is it important that we rebuild our submarine program?

3:22David Ulevitch:I think the real advantage that submarines bring is our stealth and access. We can pretty much go anywhere in the world undetected. And so that becomes a very big threat for our enemies or adversaries. And as I look at the two biggest missions that we satisfy, we have fast attack submarines that go out and operate, and they make sure that our seaways and waterways remain free and open to anybody who would try to shut them down. And you heard Chris talk about how Australia needs to get supplies from external. Well, the submarine force can make sure that those supplies make it when they need to and where they need to.

4:01David Ulevitch:The other mission, which is our number one mission in the Department of War, is strategic deterrence. So we carry nuclear missiles on our ballistic missile submarines, like the Columbia class that we're building. That ensures that we continue our decades of peace without nuclear war because the submarines are unable to be found. So that assures that any country that tried to attack us with nuclear weapons would be destroyed. And that's why we call them the survivable leg of our nuclear triad.

4:32Robert Gaucher:That is that second strike capability. So nobody attacks us because they know the submarines are out there and they can attack back. When we talk about industrial capacity, I'll start with you, Admiral. Then I'll go to Chris. What does it mean to say that we need industrial capacity?

4:50David Ulevitch:Yeah, so what it means, just a quick history lesson. At the end of the Cold War, we walked away from manufacturing. We only built about three submarines in the 1990s until we started up the Virginia-class program again. And even when we were building at a rate of one per year, that was only about 13 million hours of work that was required to build a single Virginia-class submarine. The amount of work that we need now to build our 2-plus-1 to replenish our fleet and to replace our Ohio-class ballistic missile submarines with Columbia is on the order of about 70 million hours. So that's more than five times as much as where we were just a little over a decade ago.

5:31David Ulevitch:And so we're still on that trajectory because of the focus on shipbuilding and maritime dominance. We're really trying to supercharge that with investments like we have here at Hadrian.

5:41Robert Gaucher:And Chris, how do you think about industrial capacity and what it is and what it means?

5:46Chris Power:I think about it very similarly to the Vice Admiral. At the end of the day, the capital equivalent can be purchased by Hadrian and all of Hadrian's investors or the United States Navy. But the real thing that we lost post the Cold War was the skilled workforce. And that's what we talk about when we say hours. And because we cut the jobs down by, you lost nine out of 10 jobs. And then we told all the kids in the 80s and 90s that in manufacturing, go get a four-year journalism degree. So the big gut is that really smart people the work and through the rest of the enterprise, we need 10, 20 times more of them to even catch up and meet the vice-presidential goals.

6:26Chris Power:But most of them are in their late 50s, mid 60s, because we lost this demographic of skilled people. For us, the power of combining the new workforce, it's kind of American software, American steel, and American spirit is you have to get this productivity jump somehow with advanced factories. Otherwise, it's not a money problem. We could spend$10 billion hiring this man, 2 million welders that he needs. They just don't exist in the country. We have to get this productivity uplift by fusing workforce training and software together to go a lot faster. That is the main problem. It is the people problem.

6:59Robert Gaucher:So, Admiral, you stepped into a new role. You've served in the Navy for a long time, but you are the Pentagon's first direct reporting portfolio manager for submarines. That means you report directly to Deputy Defense Secretary Steven Feinberg. people have colloquially called you the submarine czar. What is a submarine czar and why was this role created? Can't we just order submarines and get submarines?

7:25David Ulevitch:So the reason that the Deputy Secretary of War decided to create the direct report portfolio managers, or we call them DERPMs. Submarine czar is a much better title than DERPO. So there's three that were created and they're all related to strategic deterrence missions. You have Golden Dome, which is meant to defend the country against missile attacks. Then you have the critical major weapons systems, which are the Air Force nuclear triad programs, so the bombers and the ground-based intercontinental ballistic missiles. And then the third leg of the strategic triad is submarines. You see that nuclear strategic focus where we said we've got to get these programs right.

8:06David Ulevitch:And so the deputy wanted to make sure that they got elevated so that any bureaucracy that could be inserted along the way could just be short-circuited so that we really focus on the outcome that we want, which is to build more submarines, to stand up Golden Dome, and then to fix our ground-based leg and air-based leg of the triad.

8:25Robert Gaucher:So how do you think about success over the next three to five years? We heard about this factory being a 50-year-plus initiative, but how do you think about success in the near term?

8:36David Ulevitch:I look at success as being on the cadence to deliver the submarines we need to deliver. We may not be at the rate in three years, but we have to be closing on it and we have to have all the levers that we need to pull moving in the right direction. Obviously, a huge portion of that is this outsourced work as we build capacity because we don't have enough of it in our private shipyards that traditionally build submarines. We need to spread that throughout the rest of the country in order to be able to get that capacity up and to be able to hit the cadence that we need.

9:08Robert Gaucher:So this next question, I'll start with Chris, but then I'll go to you, Admiral. What is the hardest part of working with the government, working with the Navy, coordinating across primes, working with all the other folks you work with, working with legislatures? How hard is it to actually restart this industrial base?

9:28Chris Power:I would say three years ago was incredibly difficult. And now, honestly, to pull something like this off for the last six, seven months with Deputy Secretary Feinberg, Secretary Phelan, honestly, compared to the size and scale of something like this, if you're in the commercial sector, is pretty fast. But it's because Congress, both the Senate and the House, the Navy, the Department of war has really hit the go fast button and removed a lot of these blockers. And secondly, it's cultural. One of the smartest things we could be doing is, hey, there was a single accountable person that just runs this instead of 20 people trying to contribute.

10:10Chris Power:And now that that's all getting cleaned up, not just in submarines, but in drone dominance, in Golden Dome, you know, unfortunately, the vice admiral's got one of the toughest jobs at the company, but there is now a single person in command to control the entire enterprise. They can make fast decisions, take risks, place multiple bets. We're going to be successful here at Hadrian with the enterprise, but we need to put like all of the bets in the ground now because the three or four years for us to pay off. So let's just do multiple things. That's not possible unless there's a single man or woman in charge.

10:40Chris Power:And that's been the biggest sea change of how easy or hard it is to deal with legislature, the Navy, the Department of War.

10:48Robert Gaucher:And Admiral Goucher, you have a lot of different stakeholders that you're herding together, primes, suppliers, other folks across the Pentagon. What are you finding to be the most difficult parts to coordinating success?

11:01David Ulevitch:I think you nailed it. There are a lot of stakeholders. And I kind of joke, when there's a law of conservation of authority, when I get it, somebody else loses it. So you've still got to work through all that. And the truth is, we're really in the transition program. I mean, I'm really about a month into the job right now. So we want to do that in a controlled manner. A good example is this Hadrian deal was on the cusp of being solved. And so I went and talked to Jason Potter and the secretary and we said, hey, don't jump in the middle of this. Let's get this across the goal line. And so things like that.

11:33David Ulevitch:But as we kind of move forward and I am starting to take things on, we just got to make sure that we have a smooth transition. So hopefully within a couple of months, I'll be able to say that, hey, I'm past that and I'm on to bigger problems of how do we build submarines faster? And then we're moving that ball down the field.

11:48Robert Gaucher:And Admiral, I'm going to ask you a question about drones and missile interceptors, because we see them in the news all the time. In the fight in Iran, we see lots of talk about drones and missile interceptors. It's a pretty rare opportunity to have someone like you who has been a submarine commander who can talk about the silent fleet to a certain extent. Talk about where submarines still fit in even a modern conflict today. to the extent that you give us some insight into how we should think about the criticality of submarines beyond just the second strategic deterrence and the nuclear triad.

12:23David Ulevitch:Well, I think as long as we keep thinking forward and pacing our adversaries, submarines will always have a place. I look at just today, our ability to get off of another country's coast undetected. We can choose what we want to deploy from there. I mean, I can shoot a missile or I can shoot a torpedo. and as we look to underwater drones, we can start to tailor those. The real advantage there is that we can then build the payload and whatever I want to deliver outside of the submarine and then I just have to figure out how to load it on and I could pick my payload. So whatever the conflict is of the future, that gives us an opportunity.

12:59David Ulevitch:The other thing that we can do, because we're self-sustaining, we have our own defense, we have our own command and control capability, is I could control other things. So I could see a world where a submarine goes far forward. It connects with a network of drones to give the signal so you still have a human in the loop to make the decision or to see what's happening and provide that. And the submarine may never have to shoot a weapon.

13:24Robert Gaucher:Amazing. I want to shift to the factory here in Alabama. Chris, this is more than just a factory. It's really going to be a modern, advanced manufacturing facility. Talk to us a little bit about how a modern software-driven factory works differently than a traditional factory.

13:41Chris Power:There are two big things. A big thing, number one, is we don't have enough machinists. We don't have enough quality inspectors. We don't have enough welders in the country. So at that task level, we have to get them 90 % more productive and make the rest of the time human in the loop easier. Because if you want to train a Navy welder today, it's going to take you a decade. So we have to augment the skills with software and also make it more accessible for training new workforce. That's number one, because if we translate the 70 million hours target into people with software, we can make that 50 % less people, 70 % less people.

14:18Chris Power:The second thing is the flexibility that constructing something like a submarine demands is incredibly what we call high-mix, low-volume, right? So if you're building a Toyota Camry, you're making 20 ,000 of them a year. You can set up production lines that are just cranking out nuts, bolts, components, assemblies in traditional kind of factory automation, like Foxconn with Apple, right? You can easily automate a million iPhones. What the software enables is running at that level of factory productivity, but with the flexibility that something like a submarine demands. Because you don't necessarily need 100 of the same thing.

14:55Chris Power:You need one and you need a slight variant, especially with sustainment and maintenance and even submarine construction. You don't know when you need stuff anyway. So having this flexible manufacturing system, apart from the raw productivity, it really is the speed and flexibility to reconfigure lines to give the yards what they need kind of on demand versus, oh no, I realized that I need a spare to keep submarine construction going and you go back to the supply chain and it might take 12 months and the whole thing's just stalled out. So it's really the velocity and agility and reducing the amount of people because we just don't have the people in the US.

15:29Chris Power:We have to get this productivity uplift with software and a new workforce.

15:33Robert Gaucher:Yeah, I've seen some of your other factories and your other facilities and people are going to come to start to recognize the importance of being able to change out the product line, increased throughput, have better visibility into the entire production line. It's really tremendous. Admiral, when you look at a facility like this, I know you're still ramping up to speed in your new job, but you look at the potential of a facility like this and you start to dive into the supply chain. Where do you feel we can make the most impact around capacity? Where do you feel like there's the biggest bottlenecks and areas where we might find other opportunity to help increase our rate of production?

16:08David Ulevitch:There's a couple things that I'm looking at right away for this facility. One thing is our in-service submarines. So submarines that have already been built but have to go through their periodic maintenance, maybe to repair a pump or a valve. I think the opportunity to take obsolete parts where the companies have gone out of business, turn it over to Chris, have them figure out how to manufacture or use at the facility here, obsolete parts, and then turn them back over so we can keep the existing submarines running will be a huge early opportunity for us. The other part of this is one of the big holders, and I'm gonna riff a little bit off what Chris was just saying with the factory.

16:46David Ulevitch:There's really three things you need to build a submarine, right? You gotta have people, right? At some point you have to turn some wrenches, okay? Those people have to be productive. And what I would tell you is in some areas today, we are less than 50 % productive. So essentially for every two people, I'm getting one hour, right? And that's no one's fault. That's just where we are. It has to do with experience. It is an exceptionally difficult process. And it's always been that way. But I think even if we were operating at our peak performance of the mid-1980s when we were pumping out four submarines a year, we were still only at about 0.7 or 0.8.

17:21David Ulevitch:I mean, only so productive you can get with a human. So I think by using machines, we have an opportunity to actually get that productivity up. Not only are we able to run it around the clock, we're able to be more effective in doing it. And then the last thing that you need is you need the actual parts, which we've been talking about. And the biggest thing that we find as you walk around our yards, it slows them down and stops them is what's called sequence critical material, right? You get to the point where I've got one more part I've got to have, and I can't finish the step. And I've got to get to that and be able to manufacture.

17:53David Ulevitch:As we get spun up past the first articles and we really show the capability of this plant, I think those will be the types of things that we push down here. And Chris and I have already talked about things. It's things like air flasks. It's things like our hatches for escape trunks and things like that, that he's very confident we'll be able to do here in this plant.

18:12Robert Gaucher:That's fantastic. I think, yeah, having software, as Chris mentioned, play a role in making sure that, you know, if you only have 95 % of the parts, that's not enough to make a submarine. You need 100%. And having software help drive some of that production line and provide visibility is really key. So Chris, turning it back over to you, how are you going to prove to the Navy that you can bring up this capability and deliver quickly?

Read the full transcript

18:35Chris Power:Firstly, we've already proven it, but I will say this is a like generational huge lift, right? This is going to be 600, 700 people just setting the thing up. You know, what I think is we've got a really good plan. We've got really good partners in the Navy. We've got really good partners in the primes that own the designs. And I think everyone understands that we're going to go super fast and shove things through the qualification system as fast as possible to make sure we're de-risking it as fast as possible. And then building a submarine is complicated. Some of this is going to come online fast in seven months and some of it's going to take two years.

19:08Chris Power:The other thing, frankly, that we're dedicated to is the way we've structured this is basically we can't be successful out in the Navy, but we're also capital at risk. So we are strongly incentivized to basically, I'm sorry, it comes down to culture, sweat bullets until we pull this off, not just because of the mission, because of how we've structured this entire enterprise.

19:28Robert Gaucher:Okay, so we're going to wrap up here in a few minutes. I want to talk about a couple last questions. The first, we talk about a Columbia-class submarine, costs$16 billion, takes almost a decade to build, carries the nuclear deterrent. And then in my world, in the venture capital world, we talk about companies like Ceronic and Anderle that are building very small, much more lower cost, autonomous vessels, underwater drones. They cost a fraction of that, and they're designed to be attributable, to be expendable. How do these things fit together, Admiral?

19:59David Ulevitch:I think that the process of manufacturing some of those drones has some similar corollaries because you're having to build an integrated system. And so when you build a submarine, that's a similar process. You'd actually, some of the experience that companies like Anduril get from building these unmanned systems can translate to building modules for submarines. To be honest, I had that conversation two days ago with Anduril and how we get to that end state. I do think there are some corollaries, but you also have to remember that those drone capabilities are typically a single mission. And part of the value of whether it's a submarine or a surface ship with humans on board is that they are multi-mission systems.

20:40David Ulevitch:They're not just a niche tool. They're a responsive, versatile tool that can do any number of things.

20:46Robert Gaucher:I liked your comment earlier about also the submarines can be the command and control for a whole fleet of autonomous systems. That was very cool. So, Chris, I want to kind of start to wrap up with you here. This is factory four. You're endeavoring to have factories five, six, seven, eight, and beyond. What has to go right to make this model repeatable across the country? And what's one misconception that you want to make sure that everyone here today and everyone who's listening at home when we release this, what's one misconception that you want to correct for them so that they know about building and manufacturing here in the U.S.?

21:19Chris Power:I think the biggest misconception is, hey, it's all automated. We don't need the people. Like the amount of software engineers, the amount of smart people from Tesla and SpaceX and GE that we need to set the things up and the amount of workforce development, it has to be a national mission. And it's all about the people and the productivity combined. We've already proven that we can do this in different states. I think people do not understand how complicated a submarine is to construct and design. And secondly, if you think about easy manufacturing and difficult manufacturing, and maybe you put Starship at the top of the list, submarines in terms of tolerancing and precision and quality and welding are easily number one.

22:01Chris Power:So to do something like this for the first time ever, that's not the private shipyards or the Navy itself and do that knowledge transfer is a huge deal. Because it's not just making this stuff, the level of precision and quality we have to operate here is as hard, if not more difficult as building a rocket or something like that. And this is like a very, very serious endeavor because this man has to send a bunch of sails underwater and like this thing has to go 100 % right for 30, 40 years. It's huge.

22:32Robert Gaucher:Admiral Goucher, we are very, very lucky to have you here. I believe these are your first sort of public remarks that you've taken on this new role. You've been a submarine commander. We are just incredibly fortunate to have you here. We're incredibly fortunate to have you serving our country. Both of you gentlemen, I want to thank you for being here, for everything you're doing for our country, and thanks for doing this.

22:52Chris Power:Thank you, David. Appreciate it.

22:54Robert Gaucher:Yeah, thanks very much.

22:57Chris Power:thanks for listening to this episode of the a16z podcast if you like this episode be sure to like comment subscribe leave us a rating or review and share it with your friends and family for more episodes go to youtube apple podcast and spotify follow us on x a16z and subscribe to our sub stack at a16z.substack.com thanks again for listening and i'll see you in the next episode As a reminder, the content here is for informational purposes only, should not be taken as legal business, tax, or investment advice, or be used to evaluate any investment or security, and is not directed at any investors or potential investors in any A16Z fund.

23:36Chris Power:Please note that A16Z and its affiliates may also maintain investments in the companies discussed in this podcast. For more details, including a link to our investments, please see A16Z.com forward slash disclosures.

23:55We'll see you next time.

From the publisher

David Ulevitch speaks with Chris Power, founder and CEO at Hadrian, and Vice Admiral Robert Gaucher, the Pentagon's first direct reporting portfolio manager for submarines, at the opening of Hadrian's Factory Four in Cherokee, Alabama. They discuss the state of America's submarine industrial base, why the Navy now needs more than five times the manufacturing capacity it had a decade ago, and how software-driven factories and a new workforce can close the gap.

 

Resources:

Follow Chris Power on LinkedIn: https://www.linkedin.com/in/powerc/

Follow VADM Robert Gaucher on LinkedIn: https://www.linkedin.com/in/robertgaucher/

Follow David Ulevitch on X: https://x.com/davidu

Stay Updated:

Find a16z on YouTube: YouTube

Find a16z on X

Find a16z on LinkedIn

Listen to the a16z Show on Spotify

Listen to the a16z Show on Apple Podcasts

Follow our host: https://twitter.com/eriktorenberg

 

Please note that the content here is for informational purposes only; should NOT be taken as legal, business, tax, or investment advice or be used to evaluate any investment or security; and is not directed at any investors or potential investors in any a16z fund. a16z and its affiliates may maintain investments in the companies discussed. For more details please see a16z.com/disclosures.


Hosted by Simplecast, an AdsWizz company. See pcm.adswizz.com for information about our collection and use of personal data for advertising.

More from The a16z Show

All 489 episodes
Submarines and the Future of Defense ManufacturingThe a16z Show · 24 min
Listen in VO