In short

Minnesota’s regulated utilities treat distribution spending as “non-discretionary” engineering/maintenance, with limited regulatory scrutiny, even though distribution is now where two-way power and grid-edge tech (rooftop solar, batteries, EVs/chargers, DERMS, VPPs) create new planning choices. Guests argue regulators should require the same kind of modeling, sensitivity analysis, and cost optimization transparency used for generation and transmission.

Guest backgrounds

Sidney Lieb, Assistant Commissioner of Regulatory Analysis, Minnesota Department of Commerce. Pete Wyckoff, former Deputy Commissioner for Energy at the same department; now Vice President for Policy at Evergreen Action.

Key claims

Distribution budgets have grown from ~10% to nearly 30% of utility capital spending. Utilities don’t use AMI data in load forecasts, don’t allow interveners to challenge forecasts, and overvalue reliability (distribution outage hour value >50% higher than MISO’s market valuation). Incentives favor building physical assets over cheaper “non-wires” alternatives.

Notable examples

tree trimming vs costly wire undergrounding; Excel’s distribution planning; Excel’s Capacity Connect distribution batteries settlement; DERMS/software enabling avoiding substation upgrades; proposed “move beyond prudence” to compare alternatives (not just “better than nothing”).

Written by AI. May contain mistakes.

Chapters

0:45

Understanding Distribution Systems

A discussion on the role of distribution systems in utility spending and their increasing complexity.

“The stuff you see around you in your neighborhood.”
4:27

Regulatory Insights on Distribution Spending

Sydney Lieb discusses how utilities plan distribution spending and the lack of regulatory scrutiny.

“Just by way of background level setting here, I talked about this, I touched on this in the intro, but let me expand a little.”
9:45

The Importance of Distribution System Spending

Pete Wyckoff elaborates on the significance of distribution spending and its implications for utilities.

“Lots of people, if you just talk to on the street, assume that.”
14:01

Understanding Distribution System Spending

Learn about the various components and budgeting of utility distribution systems.

“not-for-profit municipal and cooperative utilities.”
17:20

Debating Mandatory vs. Optional Utility Investments

Explore the debate over what constitutes mandatory spending versus optional investments in utilities.

“I think those are the types of things that need to happen.”
20:51

The Trade-offs of Reliability Standards

Discuss the complexities and trade-offs involved in setting reliability standards for utilities.

“And even once it gets down to state by state is oftentimes software decision by software decision.”
24:47

Assessing the Cost of Reliability vs. Efficiency

Analyze the financial implications of achieving higher reliability in utility services.

“But, again, like that's going to be a tricky argument.”
28:00

Reliability and Cost of Distribution Systems

Discussion on the increasing costs of distribution systems in relation to reliability.

“But there's a whole huge stack of these things, and some of them matter more than others, and we should focus on the things that matter more.”
30:00

Evaluating Utility Outage Valuation

Examining how utilities value lost power and the economic implications.

“And I really loved my team because my team came to me and said, we did this calculation.”
34:30

Importance of Distribution System Budget

Highlighting the growing share of distribution system budgets in utility spending.

“Is it the case that they are increasing the value of reliability over time, or is it just the case that they've set it very highly and the system is getting older?”
Show all 22 chapters
36:30

Non-Wires Alternatives in Distribution Planning

Discussion on the potential of non-wires alternatives to enhance distribution system reliability.

“actual electricity have been falling and falling, but it's been countered by the rise, particularly of distribution systems.”
39:20

Regulatory Oversight and Utility Responsibilities

Exploring the regulatory expectations for utilities regarding their distribution system planning.

“So they need to know where they have constraints on their system and the battery needs to go in that location, not just any specific feeder where they can site it.”
42:05

Regulatory Homework for Utilities

Discussion on the need for utilities to justify their distribution spending through better data use and forecasting.

“Well, this gets perfectly to my next question, which is you're asking utilities, well, you're asking regulators to force utilities to do more homework, basically.”
44:43

The Prudence Test in Utility Spending

Exploration of the prudence test and the need for utilities to demonstrate effective spending decisions.

“They need to understand where the constraints are.”
46:46

Complexity of Forecasting Demand

Insight into the complexities utilities face in forecasting distribution demand amidst evolving technologies.

“No, they just test to see if a drug works better than nothing.”
48:56

Balancing Speed and Analysis in Utility Planning

Discussion on the potential trade-offs between thorough analysis and the need for speed in utility planning.

“You know, AI and data centers are coming all over the place, industrial electrification, blah, blah, blah.”
50:15

Concerns Over Spending Caps and Affordability

Critique of spending caps on distribution and implications for future investments in the energy system.

“You like to talk about VPPs and virtual power plants and taking advantage of home solar and home batteries and all these other resources out there that we haven't taken advantage of.”
52:26

Investment Pressures and Cost Management

Examination of the pressures to increase spending on the distribution system and managing costs for consumers.

“And if you're setting a spending cap now, I guarantee you don't know what that ideal number is.”
56:00

The Need for Affordable Energy

Discussing the importance of reducing energy costs for Americans and the investment challenges ahead.

“we're going to need to do it because we just need to increase affordability.”
56:57

Distribution Utilities and Planning

Exploring the role and challenges of distribution utilities and the need for improved planning processes.

“distribution utilities, do you think that all this same basic logic applies to distribution utilities in restructured areas, or is it a kind of a different situation there?”
1:00:36

Regulatory Challenges in Distribution

Examining the enforcement mechanisms and regulatory requirements for effective distribution system planning.

“So the distribution system planning is not something that was legislatively mandated.”
1:06:07

Holistic Planning and Future Visions

Discussing the need for holistic planning across states and the vision for better utility regulation.

“We need to step back and do more holistic planning.”
A man walking through an airport, asking his phone a question

Ask about this episode

Get the gist, explore an idea or ask about something said.

Claude

On Volts, what are the key points of this episode?

Searching your listening

Transcript

Automatic transcript. May contain errors.

0:05Pete Wyckoff: Hello, everyone. This is Volts for July 8th, 2026, forcing utilities to justify their distribution system spending. I'm your host, David Roberts. Power utilities are responsible for the three big parts of the electricity system. Generation, i.e. power plants. Transmission, i.e. the high voltage lines that carry electricity over long distances. And distribution, which is the local networks of transformers, power poles, and power lines. The stuff you see around you in your neighborhood. When it comes to spending money on generation and transmission, utilities choices face considerable regulatory scrutiny.

1:00Pete Wyckoff: They are obliged to carefully model those systems, produce detailed projections, and demonstrate to regulators how their plans optimize those systems at least cost to consumers. Their spending on distribution systems, however, has not traditionally faced the same scrutiny. Distribution systems have been viewed simply as delivery mechanisms. You build enough transformers, poles, and lines to get the power to customers, replace them when they get old, and that's that. Utilities bucket this as mandatory spending, and the only scrutiny it receives from regulators is to make sure they're paying reasonable prices for the equipment.

1:46Pete Wyckoff: However, if you've been following Volts for a while, you know that distribution systems are where all the action is these days. That's where all the technologies that we cover here, rooftop solar, batteries, EVs and EV chargers, home energy management systems and virtual power plants that tie all that stuff together, are located. Distribution systems have become much more complex. They can be used now as a grid resource, not just a delivery vehicle. And there are many more choices now for exactly how to plan and construct them. What's more, rising distribution system costs are the biggest portion of Americans' rising electricity bills.

2:31Pete Wyckoff: Many people, including many Volts guests, have been pressuring utilities to think more creatively about distribution systems. To embrace new technologies and to use the distribution infrastructure they've already built more effectively. If you haven't yet, you should listen to our episode on grid utilization. which is all about that. But my guests today believe that some of this amounts to putting the cart before the horse. They believe that if utilities are going to get creative with distribution planning and spending, then that planning and spending should come in for the same kind of regulatory scrutiny as their other buckets of spending.

3:12Pete Wyckoff: Utilities should learn how to better model distribution systems so that regulators can ensure their choices optimize those systems as they grow and evolve. As we've said on volts many times, left to their own devices, utilities tend to prefer concrete and steel, more spending, whereas many of these new technologies can produce the same results for cheaper. Sidney Lieb is the Assistant Commissioner of Regulatory Analysis at the Minnesota Department of Commerce. Pete Wyckoff was until recently that department's Deputy Commissioner for Energy. As of a few weeks ago, he is the Vice President for Policy at Evergreen Action.

3:56Pete Wyckoff: They are recommending that Minnesota regulators require much more analysis of distribution systems from their utilities before they sign off on that spending. Today, we're going to talk about why, what that scrutiny would look like, and what they hope the outcome would be. This is a nerdy one, y 'all, but it is important. And honestly, I love this shit. All right, let's do it. So with no further ado, Sidney Lieb, Pete Wyckoff, welcome to Volts. Thank you so much for coming. Thank you so much, Dave.

4:32Sydnie Lieb: Thanks, Dave.

4:34Pete Wyckoff: Sidney, let's start with you. Just by way of background level setting here, I talked about this, I touched on this in the intro, but let me expand a little. how utilities, we'll just take Minnesota as an example, how utilities determine their distribution spending and how it is treated differently than generation and transmission spending by regulators. What is the process now and how is distribution different than those other buckets?

5:03Sydnie Lieb: Sure. So I think I want to start with just describing how we do transmission and resource planning. In Minnesota, we're a vertically integrated state, so our utilities are planning and owning their own generation. And both the transmission and the generation processes are very robust regulatory processes. Transmission is largely planned at the level of the regional ISO, which here is MISO, and it's a multi-year planning process to look at how much load is going to exist within the region, how much generation there is, where that generation is, where there are constraints on the system. And there's several scenarios and sensitivities that are looked at to assess, you know, if you have 10 % more load in one location, what does that necessitate in terms of transmission build-out that's needed?

5:57Sydnie Lieb: And now with some of the federal requirements at FERC, we're also seeing a lot of consideration of grid-enhancing technologies alternatives that might reduce that transmission. And whenever you're planning transmission, you're looking at the trade-offs between having a generator closer to load versus having a transmission line there. And it's a very robust process that involves many stakeholders. You have consumer advocates coming in, you have environmental groups coming in, you have utilities coming in, you have states coming in. And through a two-year process, they plan out the optimized transmission system.

6:30Sydnie Lieb: At the same time at the state level, when we have a resource plan come in, utility comes in, they have a load forecast, they have economic forecasts on how much energy prices are going to be both in the market and also to procure generation. And they come in with their preferred plan of what they think the economic optimal solution is for that generation. And then any other intervener can come in and say, we think we should have more of this type of resource. We think your load forecast is overblown and we think you're actually building out more than you should. We think there should be a mix of distributed energy instead of just grid scale.

7:08Sydnie Lieb: And all of those decisions go through a clear economic optimization. On the distribution system, utility essentially buckets spending into two types of spending, discretionary spending and non-discretionary spending. And the discretionary spending is a relatively small amount. These are projects that could or could not be done this year and they look at some pros and cons there. But on the non-discretionary spending, which is most of what's driving these significant budget increases, the utility doesn't look at any sensitivity in their load forecast. They're not informing what's happening on their system.

7:46Sydnie Lieb: They could be informing the load forecast with advanced meter AMI data that we have now so that they could better predict whether or not they're going to see electrification growth in a region or they're going to see more distributed solar in a specific part of the grid, but none of that goes into the forecast. And even worse, I think, is that there's no opportunity for any intervener to come in and say, if we think this load forecast is off by 10%, we could save tens to hundreds of millions of dollars depending on the system and the investment. But right now, there's no opportunity to do that because the utility says, we've made these decisions, they're engineering decisions, they're necessary to maintain reliability of the system, and we're not having any discussion about whether or not we made the right investment decision on these discretionary spending topics.

8:41Pete Wyckoff: Just, this is Pete, just, you know, back it up to a slightly higher view and topics that you've covered on this podcast before. We know how much a solar farm out in the country should cost. We know how much a transmission line should cost. The distribution systems, all the wires to everybody's houses in a metro area and all the other pieces, it's really hard to get all the data and information, which we need to get, to accurately just say how much should that cost. And that's why in the past it's been a black box, but as we'll talk in this conversation, we can't let it be a black box anymore because things are much more complicated.

9:23Pete Wyckoff: Things run two ways now. Well, yeah, I was going to, my next question was why, I mean, pulling the camera back a little bit, talk a little bit about why distribution system spending is more important now than it used to be. Why it's getting more important in terms of, both in terms of the complexity in technology, but also in terms of affordability. I think everybody's aware that electricity bills are going up. Everybody's in a panic about it. There's this affordability crisis. Lots of people, if you just talk to on the street, assume that. It's like your choice of generators that is driving costs or that is transmission driving costs.

9:58Pete Wyckoff: But in fact, it's mostly distribution. So talk about sort of the rising importance of distribution generally. Maybe I'll start there and I'll turn to Sydney for more details. But just as a general concept, we can give the cynical answer and the non-cynical answer. I think they're both partly true. The non-cynical answer I can start with is it's an aging system. It is a system we're asking more and more of as we have home batteries, as we have home solar arrays, as we have more things and kinds of things and two-way flows on the system. So it's a system that's both aging and needs upgrading for that reason.

10:41Pete Wyckoff: It's a system that is being asked to do new things. and it's a system that we are, have become, and we'll talk about this more, less and less tolerant of it being out for any amounts of time. And we'll talk about why that's a really an important question. So that's the non-cynical answer. The cynical answer, and I used to work at the federal level in electric policy, and then I came to work for Governor Walz four years ago. And one of the things I realized is that the state level with regulated utilities, these are monopoly utilities, they are for-profit utilities. They have a duty to get as much return for their shareholders as possible.

11:26Pete Wyckoff: And we as regulators have a duty to make sure they don't get an unfair return for their shareholders. But they have a lot of political power and there's political pressure. and by building things, they only get return on equity or return on equity, return on profit off of the things that are physical. When they buy natural gas, they just pass it through at cost. When they do other things, they pass them through as cost. Their profits come from building things. When I first got out to the U.S. Senate as a staffer, I had a utility lobbyist come in and said, first thing you got to know, Pete, and I'll just admit this, is we don't sell electricity.

12:07Pete Wyckoff: That's a loss leader. We build stuff. And we're always going to want to build stuff. So we're all for the clean energy transition. If it means we have to build things, we can undo the clean energy transition to build more things, whatever. We just want to build stuff. This is, I'm sure you both know, a frequent theme here on Volts. And of course, you know, people who listen to Volts know that lots of these new technologies that are popping up on distribution systems, I mean, not just the new ones like energy efficiency, for instance, but also a lot of the new ones like home solar, home batteries, software, virtual power plants, all of these in one way or another have the effect of reducing the amount of stuff that the utility has to build.

12:52So there really is a very fundamental conflict between utility incentives and the best

13:02Pete Wyckoff: technology solutions for distribution grids. And I know we're going to talk about how regulators can sort of ameliorate that and restrain that, and that's all to the good. But as I frequently say, I just it's hard for me to imagine the optimal solution to these things in the long term without that basic incentive problem being addressed somehow. And of course, like who knows exactly how and who knows how to how to proceed doing that. But it's just like that's just like a tidal pull underneath all this in the wrong direction. Minnesota is actually an interesting case, not the only one like this, but a lot of our electric system is regulated by our Public Utilities Commission with the help from us folks at the Department of Commerce, which is where I was until two weeks ago.

13:56Pete Wyckoff: So these for-profit utilities in a regulated system. But a lot of our electricity comes from not-for-profit municipal and cooperative utilities. And looking at differences in their behavior, where one has this, let's build stuff because then we get more money versus let's not build stuff because building stuff costs money. It's an interesting place to be where you can see both the ups and downs of both systems. Yeah, it's pretty stark. So Sydney, let's make this a little concrete. So let's just take like Excel as an example. When we talk about Excel's distribution system spending, what are we talking about?

14:41Pete Wyckoff: What are they spending that money on? What falls into that bucket? What kinds of things count as distribution system spending?

14:50Sydnie Lieb: It's a lot of things. It's a diffuse system. It's things like wires, transformers, substation upgrades. I think all the hardware people think of when they think of the distribution system. It's also all the things that we do to maintain reliability on that system. So it's O &M budgets for tree trimming.

15:12Pete Wyckoff: That's operation and management for the...

15:14Sydnie Lieb: Yes, sorry. Operations and management budgets. So as utilities are thinking about their budgets, there's operations and management, which is basically a direct pass-through. Right.

15:24Pete Wyckoff: They don't make money on that.

15:26Sydnie Lieb: They do not make any profit on that. If they spend$50 million on that, they get$50 million of recovery from ratepayers. And their general preference is to minimize those types of expenses in favor of something that is a physical capital asset because that is something they will earn a rate of return on. So, you know, and one of the some of the other big budget spending categories we're seeing in these distribution plans also are undergrounding of wires. And that's one where I think it's an interesting, as Pete is pointing out, that we have we have some regulated investor owned monopolies in the state, but we also have one electric co-op that chooses to be rate regulated.

16:05Sydnie Lieb: So they are required to file a distribution plan. And there, there's a huge difference in what we're seeing in terms of targeted undergrounding of lines for reliability purposes. And the utility, there's a tradeoff between the amount of tree trimming and maintenance that you're doing versus the cost of undergrounding a line. and the utilities that are investor-owned utilities that have a real incentive to invest as much capital as possible, we're seeing that they are taking existing lines that are still in surface, do not need replacement, and saying, we're going to underground this line because now they can get the capital investment for the line that was there and an additional capital investment for undergrounding a totally new line before the old line was ready to retire.

16:52Right.

16:53Pete Wyckoff: And tree trimming is operations and management. So they don't get a rate of return on that. They don't get the profit on that. So they have an obvious preference. Right.

17:02Sydnie Lieb: And if you look at the co-op, the co-op actually brought in an independent consultant to say, where can we do tree trimming and avoid undergrounding and achieve a same or similar level of reliability on the system? And they're actually balancing and optimizing really well on those two things. But it's one of the recommendations we have, which is our utilities are spending hundreds of millions of dollars to underground lines, and they're not doing any optimization or analysis quantitatively to look at, could we just be trimming trees and avoid these investments? I think those are the types of things that need to happen.

17:36Pete Wyckoff: In case it wasn't obvious, tree trimming is a lot cheaper. Yes, I would imagine. Well, this was actually, you're queuing me up perfectly for my next question, which is sort of, you know, Excel is bucketed. All this is non-discretionary, mandatory, just engineering. Don't worry about it. Just give us the money. And let's talk about a few things within that bucket that might be contestable, that might be where someone might reasonably argue that it's not mandatory, that you have other choices. So you mentioned tree trimming versus underground. That's mainly, I think, about wildfire mitigation, which is a huge, huge thing everywhere.

18:16Pete Wyckoff: But are there other what are some other examples of stuff they're saying is mandatory where you might say, oh, actually, there are other choices? So I think one of the ones that's probably most relevant to a lot of the discussions you've been having is what can we do with some sort of grid load management DERMS type system? I've pledged recently to my listeners to explain all acronyms. So I'm going to unpack that one. Distributed Energy Resource Management Systems. Basically, systems to manage all these, you know, sort of residential and commercial solar panels, batteries, EV chargers, managing all that stuff as a resource.

19:02Pete Wyckoff: Yeah, the software you need to make the grid look like David Roberts has been telling us it should look like for years. Yes.

19:09Sydnie Lieb: Right. So I think that's one of the ones, again, like this is something that's been talked about regularly with you and your other guests is that you could be managing all of the stuff that's interconnecting on the grid as like a well-conducted orchestra. And that could avoid these very expensive substation upgrades that we're having on the system. The challenge here is that when you try to push the utility in that direction, the response you always get is, and we've actually been, these are filed every two years and we've been marching on this. This is not the first time we're taking this approach of saying what you really need is to manage the things on the grid, not to just keep overbuilding the capacity.

19:52Sydnie Lieb: The utility comes back and says, the software doesn't exist. And even if it did exist, we don't believe that it can fill the need that is needed by the physical capital investment. Yes. And if people listen to my episode with Jigar Shah, I think people know at this point that that argument just gets less and less plausible with every passing year as more and more utilities in the U.S.

20:17Pete Wyckoff: and around the world use that software just fine. Like there are, you know, it's not theoretical anymore. There are utilities out there doing this stuff and it's working. So this argument that like, oh, it's this new thing. We can't rely on it. We don't know. Like, you know, that's, it's starting to look like a kind of a rear guard action. But just to clarify, is it the case that software falls under the operations and management budget or that they don't make that they don't get a rate of return for deploying software type stuff?

20:51Sydnie Lieb: So that's a fun question. And the answer is it depends. It's state by state. And even once it gets down to state by state is oftentimes software decision by software decision. And I think our philosophy here at the Department of Commerce as a regulator would be that we would be very happy to allow the utility to capitalize a modest software investment in exchange for a very significant capital investment. investment and, you know, philosophically, whether or not there are risks and the asset life of the software is very different than the asset life of something physical in the ground. So there are some folks that may not feel it is appropriate to capitalize software.

21:39But I think getting back to like utility incentives, if we can get them to, if we are going to

21:44Sydnie Lieb: force them as regulators to make the software investment, I think there's some space to capitalize that, but the utility would rather capitalize the very large capital investment. Yeah.

21:55Pete Wyckoff: I mean, even if they do get a rate of return on software, it's not going to be as big as if you're building stuff. I mean, as a regulator, you just have to be constantly aware that their incentive, and they're not evil, this is how the system is set up, is to do the expensive thing, not the cheap thing, even if the cheap thing is the better way. Yes, yes. One other case here where there's some where you've said there's some room for dispute where something might not be as mandatory as they're trying to make it is these sort of reliability standards. Talk a little bit about kind of how they treat reliability, how they spend on reliability and how that might, you know, what are the other options?

22:40Pete Wyckoff: What could it be? How could it be different?

22:42Sydnie Lieb: Yeah, so I think this really gets to anytime somebody is coming to me now and talking about, I want to do a legislative grid utilization standard, or I want to do some sort of policy that is going to increase utilization of the grid. I've been trying to be really clear with folks that if you are going to increase the utilization of the equipment, you inherently are going to cause some, probably very small, but existing impact to the reliability of the system. Because the reason that we have overbuilt this system such that it is so poorly utilized is because we are planning it for an extremely low probability event.

23:29Pete Wyckoff: Can I jump in again? I'll be the thousand foot view guy. So I think it is really important and politically it's going to be really dicey to say and realize that the trend we've had is for fewer and fewer outages. We've built a more and more reliable system, and that is great and that is good. But as you go from 95 to 98 to 99 to 99.99 to 100%, yeah, as you go to Six Sigma, every little increment brings a huge cost as you get towards 100. It is nonlinear. There's a huge growth there. So I do not want to be portrayed as the guy who says, we should have more power outages. But if you go to no chance of a power outage, you are going to have an electric system that is so expensive that it is great.

24:28Pete Wyckoff: It's 100 % reliable. No one can afford it. So there is that tradeoff. And political systems hate tradeoffs like that. Yes, they really do. Everybody wants 100 % reliability. Nobody wants to be the person who says maybe we should tolerate a few outages a year so we don't have to spend a kajillion dollars to up that percentage. I mean, I can really get myself in trouble and say that a 99.9 % clean grid is a lot cheaper than 100 % clean grid as well. Oh, yeah. I mean, I think that's uncontroversial. It's those last increments. But, again, like that's going to be a tricky argument. And are there other, I mean, are there other reliability standards that could be used instead?

25:11Pete Wyckoff: Like, are there concrete recommendations for how to treat this? Talking about MISO versus Excel is good here.

25:16Sydnie Lieb: Well, we should talk about the power market, but I want to be really clear, too. The question that you are asking is actually our position. Our position is not we should be spending$20 million less and have one more outage hour in a 10-year period. We're not taking a position on actually making any less investment. What we are saying is Excel said, or any of the utilities in these dockets have said, we have to spend this much. Otherwise, the system will be unreliable. And they have defined what unreliable is. And this is, I think, where the MISO example comes in. And all the Department of Commerce and a lot of other interveners in the docket who are agreeing with us are saying is it's not up to the utility to make that cost optimization in a black box, not out in the transparent public, which is where regulated monopolies are supposed to make these decisions transparently so that their regulator can tell them whether or not they think that's a reasonable level of investment.

26:21Pete Wyckoff: Right. I mean, it is ultimately not an engineering decision. It's a political decision. how much reliability you want versus how much cost you want to spend. Like that trade-off at the very least should be made in public with public regulators with their eyes on it, right? I mean, that's the idea here.

26:41Sydnie Lieb: Right. And with the consumer advocates coming in as well, there's a lot of folks, the utility is not the person who speaks for low-income rate payers or small businesses. We have advocates. That's not even me. I speak for Minnesota's like as a whole, but there's plenty of folks that are just concerned with what's the impact to low income folks of a 10 percent rate increase.

27:04Pete Wyckoff: Right. And those folks have deserved to have a voice in what are we paying for what level of reliability. So what I like to say, and this is what I said to legislators over the last four years, is the price of electricity is going to be the balance of the forces making it cheaper and the forces making it more expensive. And there's a lot of things that push in both directions. If you force a coal plant, for instance, to stay online when economically it shouldn't be there, that drives things up. If you start exporting tremendous amounts of natural gas and make it a global price as opposed to a cheaper former American price, that drives up the cost.

27:46Pete Wyckoff: Just as two random examples. If you say, for instance, deny permits to wind and solar plants across the country, you might raise the price of electricity. Just pulling things out of the hat here. Right. But there's a whole huge stack of these things, and some of them matter more than others, and we should focus on the things that matter more. but as you and your guests before have shown and lbnl and our friends in the in the national labs have shown you know one of the huge drivers and we haven't even gotten to the actual numbers here and i think sydney should give us some of the numbers because they're shocking one of the huge drivers is a rapid increase in cost of this black box distribution system in the name of reliability and at some point, A, we got to make sure that we're getting that reliability for the right price.

28:36Pete Wyckoff: And then at some point, we have to decide what is the right amount of reliability to pay for before we can't afford the electricity. Right, right. We'll talk about the difference between how MISO, MISO, of course, is the sort of grid, is the transmission grid governing body that governs Minnesota, a bunch of other states in the region. Talk about the difference between how they calculate reliability and how, say, Excel does on the distribution level. Yeah.

29:03Sydnie Lieb: And I'm glad you're asking this because it's actually an opportunity for me to celebrate my staff. And I have, I tell people all the time, I think I have the best staff in all of state government, possibly the entire country in any space. My staff, one of the things they looked at was the utility was valuing an hour of outage at a certain price. And they said, you know, well, let's actually look at what the transmission market is valuing an hour of outage at that system on, because MISO is one of the biggest ISOs in the country. It's a very diverse footprint politically. It's a very diverse footprint in terms of sort of because politically, like, you have very different resources and you have a lot of industrial load there.

29:48Sydnie Lieb: And when industrial load loses power, that is a very significant economic impact. And some of our utilities are valuing an hour of lost power on the distribution system more than 50 % higher than what the power market is valuing at. And I really loved my team because my team came to me and said, we did this calculation. It can't possibly be right. There's no way the utility is valuing the economic impact of a lost hour somewhere on the distribution system where people, you know, their houses are warm for an hour at the same price as the entire MISO footprint is valuing.

30:29Pete Wyckoff: Just for folks who don't have the MISO map in their head, this runs from one Canadian province down through the center of the country to the Gulf of Mexico. And most of Minnesota is in this regional wholesale electric trading market. Right. So just to make this kind of vivid for listeners, so MISO is value. What is the value? How much would it cost a lost hour of electricity for that entire grid region? Multiple states, which include big industrial customers, et cetera, et cetera, et cetera. They are valuing that. And then you have an individual utility talking about a lost hour of electricity and an individual distribution system, like a neighborhood or a city or something, valuing that 50 % higher than MISO values reliability for that entire region.

31:21Pete Wyckoff: And of course, like to return to our previous topic, why would an individual utility rate value reliability so much more highly than an entire regional transmission system? Perhaps because that justifies them spending money out the wazoo, prevent that lost hour, right? I mean, it's hard to, it would be difficult to come up with any explanation for that other than that incentive. Am I wrong? You are not wrong. I'm stalling while Cindy pulls up the actual numbers on her computer. But that is exactly right.

32:02Sydnie Lieb: I have to make sure that I actually have the numbers and that they're not trade secret because I feel like they might be. I think the right answer is, without getting into actual numbers, that The utility is valuing the hour of loss load more than 50 % higher because that allows them to overbuild the system that much more. And again, this is getting back to, again, it's not their fault. This is the way we built the model. Investor-owned, regulated utilities make money by building things. So the more they can design their engineering standards, design their planning processes so that they have to build more stuff, the more money profit they will make.

32:47Pete Wyckoff: Numbers you certainly can give, Sydney, because I don't think we've gotten them out there. What was the distribution system budget four years ago versus what is it going forward? Is it the case that they are increasing the value of reliability over time, or is it just the case that they've set it very highly and the system is getting older?

33:27Pete Wyckoff: because we're all surrounded by depressing news about climate change and misinformation about clean energy. And it's never been more important to share the stories of the real people on the ground doing the real work of transition and all the ingenuity and courage and public spirit they are bringing to it. People are hungry to hear these stories, to learn from and find inspiration in them. I've heard from people who change majors or careers after hearing episodes of Volts. people using it in classrooms and community groups, even state legislators who have passed bills inspired by specific episodes.

34:02Pete Wyckoff: Sharing these stories matters. It makes a difference. If you have found value in it and want to help me continue doing it, I hope you will join the community of paid subscribers at volts.wtf. It's about the cost of a cup of coffee a month. If you don't like subscriptions, you can make a one-time contribution, leave a review on Apple or Spotify, or just tell a friend about volts. I am grateful for any and all support. If you're already a paid subscriber, thank you. And now, back to the show. Is it the case that they are increasing the value of reliability over time, or is it just the case that they've set it very highly and the system is getting older?

34:42Sydnie Lieb: It's the case primarily that they've set it very highly and the system is getting older. I think that's an important thing to call out as well because we have been, I think Pete said it at the onset, some of this level of investment is because the system is getting older. And that is important. And again, like the department's position is not we shouldn't make the investment. It's one, the utility has no idea how old the equipment is. The department has asked every single utility, are you tracking the age of your equipment? And they've all said, no, we just have everything on general replacement schedules.

35:26Sydnie Lieb: Which when the budget was 10 per, so I think that gets, that's one of the numbers I think is most staggering is that I think people think a lot about the transmission buildout that we're doing, the retirement of fossil and the significant buildout of renewables that we've been doing for several years now. and we don't think about the distribution system budget. The distribution system budget used to be about 10 % of the utility's total capital budget. So their total budget of things they were building. It's now almost 30%. It is on par now with what we're seeing on transmission and generation investment.

36:02Sydnie Lieb: And so it's no longer okay to say, well, we don't really know how old this equipment is, but in general, this equipment on our system is at replacement age.

36:11Pete Wyckoff: another way of looking at it is i you know when i would go up to the legislature in my role i would show all these you know we're getting generation of electricity because we're moving towards wind and solar look at how much less it's costing us to get this electricity and there'd be this pushback well i don't see in my bills and it is true generation costs and the cost of the actual electricity have been falling and falling, but it's been countered by the rise, particularly of distribution systems. Right. More than countered. That's why the bill, that's why bills are going up. So let me ask about this then, like my instinct and, you know, I had this whole podcast with Pierre Lafarge, who's making the sort of case that installing batteries in your distribution systems does increase reliability, and it is an alternative to spending a bunch more on substations and transformers and wires, et cetera.

37:08Pete Wyckoff: These are called, in the lingo, non-wires alternatives. This is how they're discussed in these contexts. In other words, this is something you can do instead of building a bunch more wires. I, of course, am a huge fan of these solutions, but some of the materials you sent me sort of seem a little less enthusiastic about them. Like, they're not really getting built and they don't really seem to be showing up. Like, what is the status of non-wires alternatives in Minnesota? So this, you know, Pierre's big first experiment is in Minnesota at Excel. And I will say, as one of the many things we accomplished in the time I was there, we pushed into Excel's IRP that they needed to be moving in this direction.

38:00Pete Wyckoff: And that's where - IRP is their - Integrated resource plan. So we reached a settlement with the parties and took it to the PUC, and it included, with our pushing, let's try distribution system batteries as something that can help us deal with the needs of the distribution system in ways that will be cheaper. the devil's in the details. So although we are the ones that reached the settlement to push this and are happy that we have this project moving forward, we are also charged with not giving a blank check to anybody and saying, this has to work as best as possible for Minnesota ratepayers and for the Minnesota system.

38:49Pete Wyckoff: And so when you sense like, well, you're not completely behind this and completely happy with how it's working. That's our job is to never be completely happy. And it gets back to the original point, which is how are you going to know if it's working? You need the utility to be modeling and projecting like, what would it be without these batteries? So then they can find out what is it with these batteries? Like you need better and more transparent distribution system planning to even know whether these things are succeeding, right? Yeah.

39:22Sydnie Lieb: And to be more specific there, both on this project specifically, because again, we were really excited we brought forward the Capacity Connect program, which is the SparkFun batteries through on a settlement that we orchestrated on Excel's last integrated resource plan. I think on that specifically, the two things that are evolving and need to happen in order for that to be a success are Excel or any utility that wants to do this needs to do robust power flow modeling on their system so that they know where those batteries are going to have the most value to the distribution system as a distribution system asset.

40:01Sydnie Lieb: So they need to know where they have constraints on their system and the battery needs to go in that location, not just any specific feeder where they can site it.

40:11Pete Wyckoff: Right. And as I understand it, they're not yet doing that. That's sort of like the plan, but they're not yet doing that.

40:19Sydnie Lieb: It is the role of the regulator to make sure that it gets done in that way. I think the other thing that needs to happen there is that the, again, the DERMS system, we defined that acronym so we're allowed to use it. That needs to be built and done well, again, so that that battery isn't doing as much good on the system if it's just sitting there. It needs to be working with the behind-the-meter stuff effectively. And the last thing I'll say on non-wires alternatives, because we're seeing this both on the electric side. We're also seeing this on the gas side. We have a gas integrated resource planning process where there's non-pipe alternatives that are happening.

40:59Sydnie Lieb: The utility is often defining the cost benefit analysis that is done to pick whether a non-wires alternative will work. And again, utility would much rather put a physical asset in the ground than come up with some alternative.

41:13Pete Wyckoff: It's like a nonprofit alternative to them. So you're allowing the utility to determine whether they should get profits or not profits. So it's pretty predictable how that's going to turn out. As we were negotiating back and forth, I kept saying to the folks, so let's say you're putting 250 batteries out into the Twin Cities. You could also just put those 250 batteries in a field in the country. It's cheaper to just dump 250 batteries into a field. So you better justify to me how you're maximizing the distribution system benefit and the grid benefits of the more expensive. Let's put them all over town.

41:53Pete Wyckoff: Then let's put them in one place. And that's where we've been back and forth and pushing, particularly Excel, to take full advantage of these distribution system assets that we are pushing for them to have. Well, this gets perfectly to my next question, which is you're asking utilities, well, you're asking regulators to force utilities to do more homework, basically. And what concretely are you asking them to do? Like, what does this homework look like? What do you want utilities to do regarding their distribution system spending? And then once they've done it, what do you want the PUC, the Public Utility Commission, the regulators, to do with that homework?

42:35Pete Wyckoff: How do you envision a better system working?

42:39Sydnie Lieb: Again, these happen every two years. And the first one was two years ago. And it was one of the first things I had since inheriting my team and really like getting everybody running in the same direction on trying to really tighten the screws on this planning process. And it is inherently iterative because it's complicated and it's hard. And you're going to take two steps forward and then come back a little bit. and try again. But I think the things that we would like to see in this iteration are the sensitivities in the load forecasts need to be looked at transparently, and they need to be informed by AMI.

43:22Sydnie Lieb: We made this huge investment in advanced metering.

43:25Pete Wyckoff: Those are the smart meters that we as ratepayers have paid for, so they exist, now use them.

43:30Sydnie Lieb: And they've been there for a while.

43:32Pete Wyckoff: This is something that is shocking, I think, to listeners who are not familiar with this stuff. We spent a lot of money. This is not just true in Minnesota, but all over the group. We spent a lot of money putting these advanced smart meters on homes and businesses all over the place. And we're not using the data they're producing in any meaningful way. And a lot of times, utilities won't even tell you what that data is. It's insane. Like, we have the intelligence capacity out there. We're not using it. It's wild. It's ridiculous.

44:01Sydnie Lieb: I mean, the way I describe it when I'm talking to people is I could be plugging in two electric vehicles in my garage and the utility would still assume that I was going to get another one in the next five years based on whatever electrification load forecast they have. Because they're not choosing to look at the data and go, oh, this person's already plugging into EVs. They're definitely not going to increase the load at this location. And they have that data and we've all paid for that data. And it is not that complicated to use it properly. So better forecasting and also allowing that forecasting to not happen behind a black box.

44:43the load forecasting needs to be able to have all kinds of interveners come into the process

44:48Sydnie Lieb: come into the regulatory space and say we think your forecast is off by 10 percent or we think you know we think you're going to get that much load but we think it's going to take 15 years not 10 and if we do that we can delay these investments right that's the big one i also think getting again back to the software side of things the utility needs to do power flow modeling of their system. They need to understand where the constraints are. They need to, again, be bringing in better data from AMI to understand where they have a lot of DERs, where they have a lot of electrification happening, and how they can make all those things work together to better utilize the system.

45:27And then lastly, there's a lot of folks talking about greater utilization and really

45:32Sydnie Lieb: excited about that. I feel really strongly that those folks are going to run into a brick wall when they try to implement what's happening at the legislature. I think folks think that they're going to give the utility a 70 % utilization target on their system. And then the utility is going to come back and say, we looked at this. The system can't be reliable at a 70 % utilization factor.

45:55Pete Wyckoff: Trust us.

45:56Sydnie Lieb: Trust us. We're not going to talk to you about it. We're not going to let you talk to our engineers. Our engineers say it can't be done. And that whole thing needs to happen a lot more transparently. And that needs to happen everywhere in the country where they're trying to do grid utilization.

46:09Pete Wyckoff: I think that's our big theme here, or one of our big themes, is show us the data. Show us how we as regulators can reproduce what you're claiming. The other thing that we haven't really talked about is moving beyond this prudence test. So basically, if they want to spend something in a distribution system, they come in and say, we put a new transformer here. Here's the receipts. We got it from a reputable supplier. It works. And the system is better than if we'd done nothing. So the analog there is most people think, you know, the FDA tests to see whether a drug works well. No, they just test to see if a drug works better than nothing.

46:54Pete Wyckoff: Um, so, so that's the prudent test. Can you beat a placebo of doing nothing? That's a pretty low, it's a pretty low bar, especially in this context. What we really want, and back to the medical analog, and it's only since, uh, Obamacare that the government's been looking at this at all is saying, Hey, there's actually five things we could do for that medical condition. Which of them works better than the others? Um, and that's what we're asking. not just did the thing you do actually happen, show us the receipts and show us you've got it, you know, not from some shady guy at the corner, but from a reputable supplier, right?

47:30Pete Wyckoff: But also, was it the best thing you could have done if there were really five things you could have done? Right, right, right. One of the questions I've had about all this is it just seems to me not to, you know, I'm not in the habit of expressing sympathy for utilities, But in this case, like, it just seems like forecasting distribution demand, distribution system demands has gotten wildly more difficult and complicated really rapidly. Like there's all these new technologies coming on board in distribution systems as we're talking about. And then there's like data centers. We really have no, I mean, you are now having to guess how fast our EV is going to spread.

48:14Pete Wyckoff: how many people are going to be charging at home versus here or there? How many people are going to get solar panels? How many data centers are they going to build in this area? You know, there's just like, it just seems like the whole thing's gotten a lot more difficult, which I guess goes to your point that like we need to make it more transparent how they're doing this. But it is kind of like a much more complicated thing these days. It's much more complicated, but you know, we have AI now and we have, you know, advanced computers And we have these smart meters. And yes, it is much harder. It is a much more complicated thing, but we also have many more tools that if we decide to deploy and use them for getting on top of that complexity.

48:55Pete Wyckoff: Well, let me ask this then, because this is one of the things, I mean, one of the big critiques these days of the electricity system overall is that it is not moving at a pace. You know, AI and data centers are coming all over the place, industrial electrification, blah, blah, blah. Things are happening very quickly and the electricity system moves very slowly. And when you describe these systems whereby utilities determine their generation and transmission spending, I mean, one of the things a critic might respond, those are very slow. Those are very slow, too slow processes. And now you're asking distribution spending to be equally slow.

49:43Pete Wyckoff: Like, is this not, is asking for all this initial analysis not going to slow things down? What about the, what about, you know, again, there's a trade-off always, but like, what about speed? So I actually think we can walk and chew gum. But I think what we are asking, pushing for is a distribution system that we can trust costs the right amount. And then we're going to lean on that distribution system to actually get us speed to power. You know, you like to talk about demand response. You like to talk about VPPs and virtual power plants and taking advantage of home solar and home batteries and all these other resources out there that we haven't taken advantage of.

50:32Pete Wyckoff: I think even with the complexity of how to get on top of that, how to do the technology for it and how to regulate it, it's still going to be a lot faster than building a transmission line across five states. I think this still is speed to power. and I think our utilities need to get very comfortable with this very fast if they're going to do the options that are best for rate payers yeah it's uncomfortable for them and as we've said several times in this conversation they're not really incentivized to do it because it will probably lead to lower profits they're gonna have to do a lot more work to make less money.

51:10Pete Wyckoff: So this is why, I mean, I'm not sure there are, like I said at the beat earlier on, there are advantages and disadvantages of a regulated for-profit monopoly energy system. And we can actually see it in Minnesota at different parts of our electric system where we have munis, co-ops, and these for-profit IOUs, investor-owned utilities. But sorry, that's the game. We should do it and it will still be the fastest way to meet the needs of data centers and EVs and do it cleanly too. Delaware has proposed, I'm told, a kind of spending cap on distribution spending as in part, I think, as a response to all these affordability arguments.

52:01Pete Wyckoff: You know, all like regulators, legislators, everybody, governors, everybody's under a ton of pressure to deal with affordability. And that, I think, can seem like an easy off-the-shelf response just to cap the amount they're spending. But you guys think that that is the wrong way to go. Can you say a little bit about why? Well, I think spending caps and rate freezes. And I'm not saying that the wrong plan in the short term, but in the long term, what you really want to say is what is the ideal amount of spending and what do we need to know and probably don't know yet in terms of inputs and data to determine that ideal amount.

52:44And if

52:45Pete Wyckoff: you're setting a spending cap now, I guarantee you don't know what that ideal number is. Yeah, it gets back to how complex it is to forecast these things. Do you want a governor or a legislature guessing at what the optimal spending is two years from now, five years from now? I mean, in the energy system in general, I think it's just like if you put rent freezes in, you're probably not going to get as much housing built. Maybe there's ways around it. Right. But maybe there are times when you just need to say enough is enough. People can't afford this. we have to put a freeze on while we get that knowledge.

53:24Pete Wyckoff: And I'm not going to judge that a priori. But I don't think it's a long-term solution to say without information, we're going to decide that this is where the price should be. Yeah, this is a worry I come back to again and again with the affordability stuff is we do want and need to build a bunch more stuff. Like that's not, you know, utilities may be, want to build more than is strictly necessary, but we do. But like things are expanding. Electrification is happening even behind data centers. There's a lot of other electrification happening. We are, we do need a bigger and more robust energy system.

54:06Pete Wyckoff: So I don't want affordability solutions that inadvertently, right, slow down the building that we do need. That's the tricky. I'm going to say something that I probably wouldn't have said two weeks ago, And Cindy's going to probably kick me because we reversed roles here. So there are things about the electric system where we're just going to have to spend more. Yeah, yeah. And I am convinced that the distribution system, we're going to have to spend more. Do we need to go from a$250 million annual expense to a billion dollar annual expense? I think we should very carefully ask questions and probably we'll end up reducing that requested increase.

54:48Pete Wyckoff: But we're not going to reduce it down to no increase. I was very disappointed in some recent actions by the Minnesota PUC. For one, they rejected our recommendation that they move beyond gas line extension subsidies, which cost rate payers every year in the tens of millions. Yeah, we did a different part about that. And then we just did an Excel rate case where the three Democrats on the, and I'm a Democrat, on the commission voted to increase Excel's ROE. Jeez. Against our recommendation as the Department of Commerce and against how the non-Democrats on the split commission voted. That's wild.

55:33Pete Wyckoff: And of course, like the more return on equity they get as a percentage, the higher their incentive to build more, like to build unnecessary stuff, like the exact incentive we've been discussing their preference for wires over non-wires, the more you increase ROE, the more they have that incentive, which is part of the problem. I think my broader point is where we can save money and where we can put a downward pressure on prices, we're going to need to do it because we just need to increase affordability. And Americans are telling you in polling that we don't want to pay so much for our energy.

56:09Pete Wyckoff: I think a lot of that is not actually electricity. That's what they're seeing at the pump. So maybe we should have fewer wars in the Middle East. But it is a real problem, and it's going to be a real problem going forward because there are going to be investments we're going to have to make that will drive upward pressure on the cost of electricity. So every time we can counter that by, let's say, moving more to wind and solar or looking hard at ROE or looking hard at other things, we should do that. Right. It's a both and. So here's a slightly technical question. We've been talking about all this in the context of these vertically integrated utilities that you've got in Minnesota that do generation and transmission and distribution.

56:56Pete Wyckoff: In restructured areas where you have generation utilities and transmission utilities and then distribution utilities, do you think that all this same basic logic applies to distribution utilities in restructured areas, or is it a kind of a different situation there?

57:22Sydnie Lieb: So Pete should probably give the national context, but As the regulator of the vertically integrated utility, I suspect that this is something that needs to happen regardless of whether or not utilities are owning generation. Right. Because the ones that own distribution, this is their main cash cow on the capital side is to put in as much capacity on the distribution system as possible.

57:50Pete Wyckoff: Right. Right. Well, if you're a distribution utility, that's your only cash cow. So it seems like all these same incentives sort of apply. Yeah. And also sort of just pulling us back to where we started on the question around, like, are we going to need to build more stuff?

58:09Sydnie Lieb: We are absolutely going to need to build more stuff. I think on the transmission and the generation side, we have these very proactive planning processes to optimize the stuff we're going to build and to allow people to really pressure test that in a transparent way. now that we are seeing it's time to replace aging poles, wires, transformers, undersized substations, we need also a proactive planning process there, or we're just going to throw away money all over the system and not be really sure that that was the right way to invest. Right.

58:46Pete Wyckoff: So Pete, would you say that, I mean, this is obviously the Minnesota Department of Commerce is recommending this for Minnesota utilities and Minnesota regulators. But would you say that this applies nationally, applies in other states? Like everybody, everywhere distribution system spending is going up, everywhere they're getting more complicated, everywhere the planning process is not transparent and et cetera. I mean, do you think this is applicable everywhere basically? I do. And I'm no longer at the Department of Commerce, so they're not responsible for my comments, but I am now in an organization that focuses more nationally.

59:23Pete Wyckoff: And yes, I've only been there two weeks, but yes, I would say from a national perspective, this is all very important. But I think it's also the flip side to what you talk about all the time on this podcast, that we want to actually ask more from the distribution system and ask more from the ability to go two ways. So if we're going to elevate the importance of the distribution system, make it less dumb. And historically, it was boring. Historically, it wasn't the big cost driver, it was the rounding error, and no one paid much attention to. Yeah. And it got interesting real quick, like in the context of how fast utilities move and how fast they think.

1:00:00Pete Wyckoff: It got interesting really quick, like overnight, basically, from their perspective. But the sort of stuff that Vols listeners tend to get really excited about goes through the distribution system. So by way of wrapping up here then, I guess I would ask maybe both of you, like, what is the vision here? What is the desired outcome? What would it look like if things were working well? If maybe just for Minnesota, Sydney, like if Minnesota regulators and legislators took your advice, what would a well-functioning process look like and what would be the outcomes?

1:00:40Sydnie Lieb: So the distribution system planning is not something that was legislatively mandated. It is something that was created in the regulatory space. And a lot of where that grew out from was we would get to rate cases. And as Pete was describing for prudency, prudency just asks, did you get a good price for this widget? It does not ask, did you actually buy the widget and did you get it at a competitive market price? It does not ask if you needed the widget to begin with.

1:01:07Pete Wyckoff: Or if there are other widgets you could have gotten instead.

1:01:09Sydnie Lieb: There's some other widget. Yeah. So I think that if the distribution plan, and again, it's an iterative process we may not get all the way this year, but it should progress into a detailed planning process so that when something is coming for cost recovery in a rate case, we can say this was a cost optimized investment and it was prudent. Because the rate case can only ask, was this prudent? It cannot ask, was it optimized? So there must be a place somewhere, and it should be this place, that you plan an optimized system. And we really look at, was there an alternative that could have been purchased?

1:01:54Sydnie Lieb: Did we not need this much overbuild of capacity in this location to begin with? And how are we balancing affordability and reliability? And are we doing that in a transparent way?

1:02:07Pete Wyckoff: Well, let me ask, this is all upstream of the rate case. This is all supposed to happen before the rate case. But I'm sort of, what is the enforcement mechanism? I mean, sort of like the rate case is where the rubber hits the road. It's where the PUC, the public utility regulators actually can give them the money or not give them the money as it were. So how would the PUC enforce this? How would it make sure that the utility is doing it well and doing it correctly? If rate cases only involve this prudency judgment, where's the enforcement mechanism to make sure the utilities are doing distribution system planning well and correctly?

1:02:47Sydnie Lieb: I think it would actually need to happen in the planning process is the utility would need to have an approved plan and then they would build to that plan. And then if they got to a rate case and they did something else, they would need to very clearly explain why they did something else and prove that that was in the public interest. And, you know, it's utility regulatory, so it might get a little bit squishy of how much enforcement authority there actually is at the commission. I think that that's really what it would happen is that you'd have an approved plan. And if you're going to deviate from that plan, you better have a very good, robust analytical explanation when you come for cost recovery.

1:03:29Pete Wyckoff: And am I correct in saying like a prudency review doesn't ask very much of the regulators? They're just like, did you, you know, is this a credible vendor or whatever? This type of thing that this type of process that you're envisioning and encouraging here is also going to ask a lot more of regulators, right? They're going to have to know a lot more and engage a lot more and have, again, to return to a Volt's theme, the capacity, the staff, the funding, the expertise to make these what are really some pretty complicated judgments about whether utilities are doing this correctly, right? I mean, you need good regulators to make this work.

1:04:13Pete Wyckoff: I think this is absolutely true. And we need to staff up our regulatory agencies. And in Minnesota, we've done a good job on this. And there will be more needs going forward because it gets more and more complex. But I'll just go back to the, there's three parts of the electric system. There's the generation. In Minnesota, we have a very robust integrated resource planning process, which I think is very good. And my understanding is there are states where it isn't very good. So we are leading there. We have, I think, in northern MISO, in particular, a sort of model transmission planning system.

1:04:51Pete Wyckoff: And Minnesota's part of that, I think, is model. So that's two legs of the stool. The third leg is distribution. We have moved from not doing much there to doing something. But what we are pushing, thanks to Sydney's brilliance and my brilliance and bringing her on board, was— Your reflected brilliance. Yeah. was we're pushing, let's get the distribution planning process up to snuff compared to the things we're already doing well. And then we have one more step beyond that, that probably a future podcast episode. We would like those three planning processes to talk to each other because we think that considering the three in isolation may not lead to the optimal solution.

1:05:36Pete Wyckoff: So we should have another layer that says, OK, let's optimize across the three legs of the stool. This is another Volt's theme. Another this is something that in in almost every different context, almost every different podcast, sooner or later, you pull the string and you get back here. We need better and more holistic planning, which we just don't do very well in any area, it seems like, in the U.S. It's like whether you're talking about municipal stuff, gas stuff, electricity stuff, it always comes back there. We need to step back and do more holistic planning. And that's sort of like, that's what you guys are all about here.

1:06:20Pete Wyckoff: And as a Minnesotan who no longer works in the state enterprise, no longer works for the regulator, but now works for a national group that tries to help take the best solutions out there and bring them to more states and tries to influence federal policy. I think as a Minnesotan, what I would like to see is Minnesota to get better and better and better at this. and gosh p what if like the states talked to the other states and there was even like national my new organization what if there was national planning give us the tools that we can say hey state x look at state y which you think you're like or better than well maybe they're better than you on this so why don't you uh get up to speed right maybe you could build less of this if they built more of that maybe we could like plan you know nationally as we can all we can all dream Well, is there anything else we missed?

1:07:16Pete Wyckoff: Anything else you want to say before we wrap up?

1:07:18Sydnie Lieb: I think we caught it all.

1:07:19Pete Wyckoff: This is beautiful. I love talking about utility regulation. I guess that's my kink. Thank you guys for coming on. This is super fascinating. I think this is like, this has kind of been hovering in the background of a million different Volts discussions, and I'm really glad to surface it, just the general need for better distribution system planning. So thank you both. Thank you so much for having us on. Thanks, everybody. You've been listening to Volts, founded and hosted by me, David Roberts, produced by Nate Peavy, and supported entirely through the generosity of listeners like you. If you enjoyed this conversation, please consider telling a friend about Volts.

1:08:01Pete Wyckoff: That's how this show grows and survives, through word of mouth. See you next time.

1:08:11Thank you.

From the publisher
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe

Minnesota regulators Sydnie Lieb and Pete Wyckoff on why utility distribution spending — now a third of capital budgets and the biggest driver of rising bills — escapes the scrutiny the rest of the grid faces, and how to fix that.

00:00 - Introduction

04:23 - How distribution is regulated differently than generation and transmission

09:25 - Why distribution matters now: an aging system and the build-more incentive

14:00 - Contestable “mandatory” spending: undergrounding, DERMS software, capitalization

22:19 - Reliability standards and the cost of chasing 100 percent

28:42 - The MISO comparison: valuing a lost hour, and the scale of the numbers

35:12 - Non-wires alternatives: batteries, the Xcel project, and modeling gaps

40:31 - What regulators should require: AMI forecasts and beyond the prudence test

47:22 - The speed objection: does more analysis slow things down?

50:10 - Why spending caps and rate freezes are the wrong fix

52:40 - Spending more anyway, and recent Minnesota PUC disappointments

55:09 - Restructured markets: does the same logic apply?

58:38 - The vision of a well-functioning process and scaling it nationally

More from Volts